The project addresses energy savings in heating industrial halls and administrative buildings in the Jihostroj production area in Velešín. It focuses on the modernization and reconstruction of heat distribution systems in individual buildings, including the gas supply to each of them, in order to increase efficiency.
The Ministry of Industry and Trade has decided to provide a subsidy within the Operational Programme Enterprise and Innovation for Competitiveness (OP PIK) in accordance with the objectives of the OP PIK Energy Savings support programme.
Financial support is provided by the European Union.
At the same time, project will introduce and modernize measurement and control systems in these buildings. It also includes solutions for reducing the energy consumption of the relevant buildings, including the installation of energy-saving lighting systems.
| Project name: | Project of Energy Savings II (PES II) |
|---|---|
| Project launch: | 8. 6. 2015 |
| Project termination: | 31. 8. 2018 |
The aim of the project is:
- reducing the energy intensity of the plant operation as such
- streamlining the plant's heating system
- reducing the energy consumption of defined buildings in the production area (reducing heat transmission through walls and opening fillings, reducing the demand on lighting systems)
The project is divided into three stages:
| Stage | Eligible expenses | Required subsidy |
|---|---|---|
| 1. Implementation I | 33.500.000 Kč | 10.500.000 Kč |
| 2. Implementation II | 4.500.000 Kč | 1.350.000 Kč |
| 3. Implementation III | 2.000.000 Kč | 600.000 Kč |
| Total | 40.000.000 Kč | 12.000.000 Kč |